AMFE (FMEA): How to Perform a Failure Mode and Effects Analysis Step by Step

A bug detected by the customer costs much more than one detected during the design phase. The AMFE (FMEA) This is the method for anticipating them. Here's how to apply it step by step. 

What is FMEA, and what is it used for?

The AMFE (modal failure and effect analysis), or FMEA In English, it identifies how a product, process, or system might fail, what the consequences would be, and what to do to prevent it. It is used to prioritize risks and take action before they occur. 

When is it appropriate to use an FMEA?

Apply it to the design a product or process, in light of changes relevant, recurring failures or customer requirements. The sooner it's done, the cheaper it is to correct. 

Types of FMEA: Design, Process, and System

The Designer AMFE (DFMEA) analyzes failures resulting from product design. The process-related (PFMEA), manufacturing or assembly defects. The system-wide It studies the interactions between subsystems. They are often linked: the design subsystem feeds into the process subsystem. 

How to Create an FMEA Step by Step

Define the scope and assemble the team

Define what you're analyzing and to what level of detail. Create a multidisciplinary team: design, quality, production, and maintenance. 

Identify failure modes, effects, and causes

For each function or step, list how it can fail (failure mode), what consequence has (an effect) and why occurs (cause). 

Assess severity, occurrence, and detection

Rate the following on a scale of 1 to 10: severity of the effect, the joke of the case and the detection, that is, the ability of your controls to find it. 

Prioritize and define actions

Prioritize the risks and define shares with the person responsible and the date: reduce the occurrence, improve detection, or eliminate the cause at the design stage. 

Review and Keep the AMFE Active

Following the actions, reassess the risk. Update the FMEA with every change or actual failure: it is a living document. 

Criteria for Severity, Occurrence, and Detection: Assessment Tables

The rating scales translate each number from 1 to 10 into a specific description. Adapt them to your industry and always apply them the same way so that the scores are comparable. 

NPR vs. Action Priority (AP): Which Method to Use

The NPR Multiply severity × occurrence × detection (from 1 to 1,000), but very different combinations yield the same result, and a serious risk may still have a low NPR. The Action Priority (AP), from the 2019 AIAG-VDA manual, assigns high, medium, or low First consider the severity, then the occurrence, and finally the detection. Compare them in the simulator. 

Simulator Before and After the FMEA

Move the sliders to see how the NPR and action priority (AP) change when you apply preventive and detection actions.

Severity of the effect8
It doesn't change with the actions, unless you redesign the product

Before the actions

Occurrence5
Detection7
NPR–
–

After the events

Occurrence2
Detection3
NPR–
–

The AP follows the action priority table in the AIAG-VDA 2019 manual (Process FMEA). Educational tool: For audits or clients in the automotive sector, always consult the official manual.

Practical Example of an FMEA on a Production Line

Imagine a screw-in line. Failure mode: insufficient torque. Effect: loose part (severity 8). Cause: miscalibrated tool (occurrence 5). Control: visual inspection (detection 7). The NPR is 280 and the AP, high. After monitoring the pair and calibrating—with occurrence 2 and detection 3—the NPR drops to 48 and the AP, to low. Try it out in the template. 

Interactive AMFE (FMEA) Template

Edit the sample rows or add your own. The NPR and Action Priority (AP) are calculated automatically, with a risk traffic light system. You can then download it as a file that opens in Excel.

Function / StepFailure ModeEffectReasonSODNPRAP
High priority0
Medium priority0
Low priority0
Highest NPR-

S = severity, O = occurrence, D = detection (1 to 10). The AP follows the table in the AIAG-VDA 2019 manual (Process FMEA); the NPR is S × O × D. Educational resource: For audits or clients in the automotive sector, refer to the official manual.

Common Mistakes When Conducting an FMEA and How to Avoid Them

The most common ones: doing it on his own or, in hindsight, describe failures in vague terms, grading without common criteria, relying solely on the NPR, leaving tasks unassigned, and do not update it. Prevent them with a multidisciplinary team and regular checkups. 

AMFE and Other Reliability Tools: Control Plan, 8D, and Maintenance

AMFE powers the control plan, which defines how to monitor critical conditions. In the event of an actual failure, the 8D analyzes the root cause and provides feedback to the FMEA. And for critical equipment, it guides the maintenance plan and the reliability. 

Profiles and Skills in Risk and Reliability Analysis

Quality and Process Engineer

Leads the methodology, prepares the criteria, and facilitates the sessions. 

Reliability and Maintenance Engineer

Provides failure data and translates the strategy analysis from maintenance. 

Head of Risk Management

Incorporate AMFE into the risk management system and keep an eye on what's happening. 

How to Train Teams in Risk and Reliability Analysis

An AMFE is only as good as the team that prepares it. At Structuralia, you'll find the Master's Degree in Risk Management to master risk analysis from an engineering perspective. 

Frequently Asked Questions About AMFE

What is the difference between AMFE and FMEA?

None of the following: AMFE is the Spanish name and FMEA the English acronym for Failure Mode and Effects Analysis. 

Who should participate in an FMEA?

A multidisciplinary team: design or processes, quality, production and maintenance, and customer or supplier, if applicable. 

How often is an FMEA reviewed?

Before changes, actual failures or claims, and on a regular basis depending on the risk. It is not a one-time document. 

Can you create an FMEA in Excel?

Yes. A spreadsheet is a good place to start: function, failure mode, effect, cause, S, O, D, NPR, and actions. To complex projects A controlled template is recommended. 

Related Articles

Request Information

If you need help